N75190 Maintenance Status

 Maintenance Item               Conducted On                     Next Due
Annual Inspection               04/15/2022                        05/01/2023
Oil Change                            09/15/2022 3381 Hr            3431 Hr  
Transponder Check             09/11/2020                        09/30/2022
Pitot / Static Check              09/11/2020                        09/30/2022
ELT Check                              Conducted at Annual Inspection
VOR Check                             Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Piper Wing Spar AD inspection complied with 5/12/2021
Interior redone Spring 2022