N75190 Maintenance Status
Maintenance Item Conducted On Next Due
Annual Inspection 05/12/2021 06/01/2022
Oil Change 12/29/2021 3168 Hr 3218 Hr
Transponder Check 09/11/2020 09/30/2022
Pitot / Static Check 09/11/2020 09/30/2022
ELT Check Conducted at Annual Inspection
VOR Check Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Piper Wing Spar AD inspection complied with 5/12/2021
Upcoming Work
-
Interior replacement in progress. Install occuring 24 February - 04 March.