N75190 Maintenance Status

 Maintenance Item               Conducted On                     Next Due
Annual Inspection               05/12/2021                        06/01/2022
Oil Change                            11/09/2021 3119 Hr            3169 Hr  
Transponder Check             09/11/2020                        09/30/2022
Pitot / Static Check              09/11/2020                        09/30/2022
ELT Check                              Conducted at Annual Inspection
VOR Check                             Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Piper Wing Spar AD inspection complied with 5/12/2021
Upcoming Work
  • Interior replacement in progress. Materials ordered but have long lead time. Expect install Jan/Feb 2022. 
  • Annual is Scheduled for 02/21/22 at OBI