N75190 Maintenance Status

 Maintenance Item               Conducted On                     Next Due
Annual Inspection               04/14/2020                        04/30/2021
Oil Change                            01/11/2021 2927.7 Hr            2977.7 Hr  
Transponder Check             09/11/2020                        09/30/2022
Pitot / Static Check              09/11/2020                        09/30/2022
ELT Check                              Conducted at Annual Inspection
VOR Check                             Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Upcoming Work
  • Carpet & Interior replacement is being planned target date spring 2021
  • Piper Wing Spar AD inspection scheduled for annual April 2021