top of page
N75190 Maintenance Status
Maintenance Item Conducted On Next Due
Annual Inspection 04/15/2022 05/01/2023
Oil Change 02/15/2023 3585.4 Hr 3635 Hr
Transponder Check 10/14/2022 11/01/2024
Pitot / Static Check 10/14/2022 11/01/2024
ELT Check Conducted at Annual Inspection
VOR Check Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Piper Wing Spar AD inspection complied with 5/12/2021
Interior redone Spring 2022
bottom of page