N75190 Maintenance Status
Maintenance Item Conducted On Next Due
Annual Inspection 04/14/2020 04/30/2021
Oil Change 01/11/2021 2927.7 Hr 2977.7 Hr
Transponder Check 09/11/2020 09/30/2022
Pitot / Static Check 09/11/2020 09/30/2022
ELT Check Conducted at Annual Inspection
VOR Check Conducted by PIC
Engine replaced w/ Penn Yann Overhaul......2443.3 Hours
Vacuum Pump replaced....................................2050.3 Hours
Upcoming Work
-
Carpet & Interior replacement is being planned target date spring 2021
-
Piper Wing Spar AD inspection scheduled for annual April 2021